Water Dam

The Water Dam is a large structure that spans a waterfall to generate power. Where the Water Turbine is a single machine on a small node, the Water Dam is a big buildable that stretches across a gap and produces Power and optionally Water for free once completed.

In-game description
"A Mighty Water Dam spanning waterfalls."

How it works

  • Water Dams are placed on a dedicated Water Dam Node, a special node found with the resource scanner. The node marks a valid waterway where a dam can be built.

  • Building the dam places a series of sections (each 10 m wide) that span the waterway. The dam auto-builds its sections to bridge the gap.

  • Once complete, the dam generates power and/or water continuously.

  • Maximum production is set by the number of sections, not counting end peices, of the Water Dam. Each section adds 50MW and 60m³/min of water to the dam’s maximum output.

Dam nodes are often, but not always, found at the top of waterfalls.
This includes some of the waterfalls along the edges of the map!

Building Information

Water Dam

Build Cost

5x Computer
5x Heavy Modular Frame
10x Rubber
50x Concrete

Placement

On a Water Dam Node (found with the scanner); auto-builds 10 m sections across the waterway

Power Output

25 to 700 MW

Water Output (optional)

60 m³/min to 840 m³/min

Water output from the dams is is optional. If turned on, outputing water costs half of the dam’s power output.

Milestones

Water Dam

Available with

HUB Tier 5: "Refined Power Mk2" milestone

Research Cost

200x Encased Industrial Beam
500x Quickwire
50x Heavy Modular Frame

The same Tier 5 milestone also unlocks the Wind Turbine Mk2, and adds Water Dam Nodes to your resource scanner so you can locate valid dam sites like ore nodes.

Tips

  • You need a Water Dam Node to build one. Scan for them the same way you scan for the smaller Water Turbine nodes.

  • Like Water Turbines, dam power is steady (no weather dependence), so it suits baseload duty alongside intermittent wind and solar power.

See also